Onshore wind turbines in open countryside

Onshore wind engineering

Site assessment, layout optimisation, civil and electrical design — and repowering of ageing parks to harvest more energy from the same land.

Aventiq engineers onshore wind farms from site assessment and layout optimisation to civil, foundation and electrical balance of plant design. We also help owners repower or extend the life of existing wind parks to produce more clean energy from the same site.

From site assessment to a bankable design

The success of an onshore wind farm is decided long before the first turbine is erected. Wind resource, ground conditions, access roads, noise, shadow flicker and grid capacity all shape the layout and the business case.

We combine these constraints into an optimised design that maximises energy yield while respecting permits and budgets. Our civil and geotechnical engineers design turbine foundations, crane pads and roads; our electrical engineers design the medium-voltage collection network and the substation.

  • Wind resource and energy yield assessment
  • Turbine layout optimisation
  • Foundation, road and crane pad design
  • Medium-voltage collection system and substation

Repowering and life extension

Many wind parks built in the 2000s are reaching the end of their design life. Repowering — replacing old turbines with fewer, larger and more efficient ones — can multiply the energy output of a site. Where repowering is not yet viable, a structured life-extension assessment can keep turbines operating safely for longer.

We assess existing foundations and grid connections, determine what can be reused and design the new configuration.

Crane assembling an onshore wind turbine

Featured project

Repowering of a 60 MW wind park

Replacement of ageing turbines with fewer, larger machines on an existing site. We assessed which foundations, roads and grid assets could be reused and designed the new layout and electrical system.

View our projects

FAQ

Frequently asked questions

What is wind farm repowering?

Repowering means replacing the turbines of an existing wind farm with newer, larger and more efficient models. It often produces significantly more energy from the same site while reusing permits, roads and grid connections where possible.

Can existing wind turbine foundations be reused?

Sometimes. It depends on the remaining fatigue life, the loads of the new turbine and the condition of the concrete and reinforcement. We assess this with calculations and inspections before recommending reuse or a new design.

Which studies are needed before building an onshore wind farm?

Typical studies include a wind resource and energy yield assessment, geotechnical investigation, noise and shadow-flicker studies, a grid connection study and an access and transport study. Together they form the basis for permitting and financing.

Offshore wind

Foundations, offshore substations, array and export cables, and installation engineering for offshore wind farms.

Learn more

Solar PV

Utility-scale and rooftop PV design, yield assessment and hybrid solar, wind and storage parks.

Learn more

Energy storage

BESS concept and sizing, safety and fire protection design, grid integration and business case support.

Learn more

Oil & gas

Brownfield modifications, platform electrification, life extension and decommissioning.

Learn more